| TYPE | ZONE B | ZONE C | Zone D (SP 158A4/ DA 20A1) |
ZONE E1 |
| Residential | $1,842/du | $4,546/du | *$1,488/du | $5,074/du |
| Residential TUMF Credit |
$0 |
$0 |
*$539/du |
$1,060/du |
| Commercial | $2,521/ac | $4,705/ac | $2,165/ac | $6,945/ac |
| Commercial TUMF Credit** |
$0 |
$0 |
$522/ac |
$1,451/ac |
| Industrial/ Manufacturing |
$2,521/ac | $4,705/ac | $2,165/ac | $6,945/ac |
| Industrial/ Manufacturing TUMF Credit** |
$0 |
$0 |
$1,451/ac |
$1,451/ac |
| TYPE | ZONE E2 (CFD 03-1) |
ZONE E3 (CFD 05-1) |
ZONE E4 (CFD 03-1/05-1) |
ZONE F |
| Residential | $2,918 /du | $2,153 /du | $0/du | $501/du |
| Residential TUMF Credit |
$1,060/du |
$1,060/du |
$1,060/du |
$0 |
| Commercial | $6,945/ac | $6,945/ac | $6,945/ac | $686/ac |
| Commercial TUMF Credit** |
$1,451/ac |
$1,451/ac |
$1,451/ac |
$0 |
| Industrial/ Manufacturing |
$6,945/ac | $6,945/ac | $6,945/ac | $686/ac |
| Industrial/ Manufacturing TUMF Credit** |
$1,451/ac |
$1,451/ac |
$1,451/ac |
$0 |
Note:
(*) All portions of Zone (D) within Specific Plan No. 158, Amended No. 4 are subject to Development Agreement No. 20, Amended No. 1. The TUMF credits will only apply to those applicants.
(**) Acreage subject to credit must be determined by Transportation for each non-residential Building Permit.
(E1)=Fee Schedule for Development within Zone E not in a CFD.
(E2)= Fee Schedule for Development within the Newport Road CFD 03-1.
(E3)= Fee Schedule for Development within the Salt Creek Bridges CFD05-1.
(E4)= Fee Schedule for Development within the Newport Road CFD 03-01 and the Salt Creek Bridges CFD05-1.
The 50% reduction in TUMF credits will be in effect only during the period in which TUMF fees are reduced by 50%.